Monday, December 28, 2009

Final Semester for Final year 27 December 2009


Done icon... 

Before I start the topic as the title as above, I would like to write something about Christmas that I had spent with my friends. That day, I together with 4 friends went to Penang Island. Long time I didn’t go Penang Island already and still remember that the last time I went Queenbay is the time my supervisor for internship treats me to eat lunch there. Suddenly miss them and think back the moment for that 10 weeks internship. There are some “bad memory” and yet a lot of good memory there. “Bad memory” gave the power for me to thrust and the good one will permanently stored inside my diary. Miss my “dirty house” as well … haha, sometimes think back it is quite funny but that time is so pity… == 

Finally, final semester for final year is coming. The time pass very fast, 7 semesters past like this, I am an old senior already, but sometimes some junior still thought that I am the first year student… kidding is it? Now I no more baby face already, and soon will degrade in exponential way because of the job later, keep on dealing with machine. Haha, so challenging, but hopefully training is provided because we really learn a lot of “theory” and learn how to operate the dinosaur era technology... my senior always yammer that now even use more SK 2 also cannot “recover” back liao… haha, she is very funny, soon will have a chance to meet all of them in our 2010 family dinner. My result for preview semester is quite good, if the required CGPA for getting Dean List is still remain the same, then I will get the only Dean list for my campus life. Cheer. 

Good luck for my final semester ahead, and bless everyone always stay happily and healthy as me… 

Friday, December 25, 2009

It is difficult, Xmas… 25 December 2009

Christmas eve, I go out with my friends, totally 6 of us go to village mall. Just to have a relax chatting with them in Secret Recipe. Some topics are really funny and they always try to make a lot of fun in the gathering. Even though our members of gang become lesser and lesser, but we always try to cherish the moment we have… haha, friendship forever.

There is something different in this year but the feeling of the Christmas eve is yet the same. I am sincere, I am hardworking for the relationship. If anyone can stand on my position to read my mind, then maybe you will understand my feeling in this moment. The thing is too difficult to me, I know that no people will guide or teach me how to do, so every time I should face it alone. I am novice here, everything is first time for me, learn to grow. I knew it is difficult before I step in my foot in to the door. Ya, again with my motto, I try to be more considerate. I have the courage to step in further to the room, I will do it :) but I cannot walk it alone, I need the courage given from you… it is boh bian, I totally understand that, but once you keep on to drop my call for just want to say Merry Christmas to you, the boy is pain. Ganbate for the boy. 

Em, make a wish sin…… don’t want to tell you all what wish I had made. Secret “recipe”. Good night :D I am fine. Miao Miao

Sunday, December 20, 2009

Pasar Malam Nibong Tebal 20 December 2009


Too free again today, and when it is too free in a room and keep facing with the computer for the whole day, I will started to think regarding nothing and my mood will become so down and pessimistic at last… haha, but I am hedonistic one, so I won’t allow it to continue happened. I went for jogging myself in the evening to release some “melanin” out from my body. Haha, it is worked.
After that, I am going to dinner with my friends to Nibong Tebal because we can ramble around pasar malam after the dinner. Long time didn’t go to pasar malam and rambling in the relax mood with friends. That is fun and we almost visit every stall in the pasar malam, not for buy, but just kacau around. Some stalls like those selling groceries are really eye-catched. There have many special and weird things to catch our attention. Sometimes really admire on their designer, they are so creative especially those products from China. They product ranging from hand-powered torchlight, stand for handphone charger, vacuum sucker…… Finally the trip end up with some junk food in our hands. 

Saturday, December 19, 2009

Enjoying the pace 19 December 2009

Sleeping, eating, doing FYP and waiting seem become the things that keep on repeating in my cycle of life. Sometimes I think that is too boring, but I am enjoying the pace of life. My course mates and I knew that this is the last school holiday for us if we did not continue to future study, we cherish every moment and continue to making fun in the school.

Yesterday night, I had a chat with an old friend and the topic we chat gave me a lot of space to think. That is a deep knowledge in that, so I started to think it before I going to sleep at around 2am. Haha, this is a good chance for me to think because I am too free in this period, but seems like I cannot get the answer before I sleep because there are no any theory that recorded in books to guide me or as my reference. Suddenly I feel like study is so easy, the book is there, statement is there just to remember and understand if compare to this one.

Everyone seems like busy, and I am the only one that is so free. The only thing I can do now is to learn more other things that I not know, to self-actualize. For those who are busy, the only thing I can do is give fully support to you, always take care of health still remain is the popular from me… I am saying you, wormie. Phew2 and GOGOGO.

I plan to go back on Monday and hope that my FYP will go smoothly as I planned. :)

Wednesday, December 16, 2009

My spoils of war before I bankrupt 16 December 2009



As I promised, now I post some info about my new laptop here, again not to show off la…== but just to share. :) It cost me 1950 bucks. The specs for the laptop is such as: Intel core2 duo T6600, 2g DDR3 ram, 320gb hard disk, NVIDIA 512gb display card. Other normal spec that suppose a laptop must have, I think I no need to mention here already. I bought the laptop at the shop I worked for the PC fair last time and here I get the 50 ringgits special discount for it. The free gifts are just a mouse and a cooler, other gadget such as laptop skin, skin protector, keyboard skin…… there are all not in my list of free gifts, but I also not manage to get it with my pocket money, because I not really need them to lagi “mess” up my desk. my desktop, i like the calender shown

My laptop is DOS, but installed pirated Windows 7 (forgive me ya). For the overall window 7 is quite nice because of the appearance of the feature design for first, and other things about the function I not sure, because I not yet familiar with that. Once thing I want to say here is the arrangement and the layout of the feature are becomes tidier than Windows XP. I like the icon, personalize which we can choose our own desire theme for “beauty” up the looks. The little gadget such as clock and alarm as well that can be set, sticky notes…… have make the overall to become more fun.

Today I downloaded new software, 谷歌金山词霸合作版2.0, and I like it very much because the functions are compatible with Google. Besides being as a dictionary, it can still use for translate the meaning to different languages… there are much more addition function that need me to discover myself and I am sure that this will help me a lot in my language because I am really noob in that. I gave this software to my friends already and until now, the rating for that is quite good. So if anyone interested in that can just take it for me, I am ready to share because I really like it a lot, it is free!

Today I met my lecture and I spent about 1 hour to persuade him to accept my design. My lecture is kinda funny and always will come out with something that hard for me to expect, he is so creative until I want to faint. The idea is work, but due to the limitation of the facilities and even the available one also very sorry, so I just can say that very sorry again. ==

I fetched my friend, YC go out by motorbike to find our FYP material and I saw a Tupperware, it looks simple but nice. I decided to bring it back because I had influenced by most of my friends around me—save the environment, stop-using polystyrenes. There is a long way to go but at least I do something right? Em, better than nothing, support.  my tupperware, RM 4.50


Tuesday, December 15, 2009

Xmas trip-KL 12 December 2009





merry  xmas


Finally, I had made my late decision to KL. At Friday morning after I send my mum go to bus station (because my mum going to KL to find my aunty), I bought my bus ticket to KL with the time 12am midnight. With simple preparation and simple pack of baggage, here I go with super excited mood. At night before going to bus station, I go and take my laptop that I ordered yesterday.

the bottle

my 'hotel'

I had spent my whole night on the bus and the bus speeding super fast until I reach KL at around 4.30 am. That is super fast @@, and it is out of my expected, so I need to spend more time in my ‘hotel’ – Mc donalds. Around 7am, I go back to Puduraya bus station to buy my bus ticket for return of my trip on Sunday, and take train to KLCC.

can see some people are jogging there outside KLCC

There are nothings I can do besides photographing and walking around there, until Christopher come and pick me up. Then we spent our time in Time Square. Then the next day we spent more time in Pavilion. Even the trip is short, but this let me to feel the cycle of your life. It is simple and I like it very much… c’est la vie, I enjoy the silent of the other hidden part in the city.decoration in KLCC, simple @@, save budget ma

Xmas decoration in Times Square

Last but not least photography section again in Pavilion, again I knew it is my solo show…== kinda paiseh but there is no choice… haha, you all have a chance again to see me :P thank you for my photographer and again for your Christmas gift and wish, I like it :D

inside and outside Pavilion

I will go back to school soon to deal my lecture regarding my FYP, hope that everything is fine after seeing him, if not I have to squeeze my mind for another few night. Cheer, next post will post about my new laptop :P not to show off, but more to share. Stay tune for more, haha, even I know you all not really interested in it.

:) i really enjoy the trip, even i knew you so busy but still pay a lot of effort on this trip for my coming for disturb... appreciate

Thursday, December 10, 2009

Sick 9 December 2009

I felt that my stomach was not so comfortable since I wake up in the early morning but still accept the invitation from my friends to join their “laksa trip”, some more I went out again at night to meet with another 1 friend (included the 2 bad girls that invite me to join the “laksa trip” hehe, kidding la :P) because I didn’t meet them since I come back from my holiday and they had blamed me a lot for always giving the reason that I don’t want come out. 

My stomach starts to be very pain until I cannot tolerate with it at around 2am, and I knew I will die in pain if I wait until the next day morning. I sweat like a pig and my body starts to shiver until I cannot walk properly. I go and knock the door of my parents’ room and show them I pity face. Without any hesitation, my father sends me to the nearest 24-hours clinic. The doctor gave me some medicine for gastric and some for the stomach pain. 

The nightmare haven’t end, I am allergic with the medicine that the doctor given to me, that is Omezole (the medicine for gastric). The dosage given to me is too strong and red patch start to appear over all of my body… so itch and I can’t sleep for whole night. 
This is considered as very lucky because it is the time I stay with my family and still remember that it happened once during the time of my industrial training and that is really unassisted. Thanks you for my parents and the special one that take care of me. 

Sunday, December 6, 2009

Project Management Assignment 6 December 2009

This is just 1 of my assignment that I had done in my final year first semester for Project Management. This is group assignment that formed by 6 team members, and I do for the phase 3 -Executing or Controlling. We get full mark in this assignment, thank you for all team members, and I feel that the knowledge here is quite useful for future especially for those who had planned to engage in field of engineering management like me… Just post it here so that I won’t loss it :) ………

INTRODUCTION
Over the years, those involved in managing projects have observed that projects have special characteristics that can be exploited to manage them more effectively. One of those areas somewhat peculiar to the project environment deals with project phases.

Projects should be structured to take advantage of the natural phases that occur as work progresses. The phases should be defined in terms of schedule and also in terms of specific accomplishments. You should define how you will know when you are finished each phase and what you will have to show for it.

The Project Management Institute defines four major project phases: initiation, planning, execution and closure. One could make the case that almost every project goes through these four phases. Within these phases are smaller gradations. Some methodologies suggest decomposing projects into phases, stages, activities, tasks and steps. However, we will only discuss the four major phases for the project in Fund Services in XYZ Investment Company. 

ACTIVITY 1
PHASE 1: PROJECT INITIATION
The launching of a project must have its reasons and purposes. The purpose of the initiation phase is to assess each particular investment against all others which Brookes might make and be clear about what it entails and the value for money which it will deliver. The early phases will shape the direction for all further efforts on the project. They provide requirements definitions, evaluation of alternative approaches, and other requires information to the project. 

Project initiation should give a clear indication of the deliverables, outcomes and benefits of the project and at a high level, the funding and resources required to deliver them with budget and key milestones outlined. At the end of the initiation phase, the project ‘mission’ should be framed, establishing: 
• the purpose, problem or opportunity which the project is addressing 
• the objective 
• the critical success factors, deliverables, outcomes, benefits and risks, and the relationship between these elements 

For Fund Services Business Unit, they noticed that they have to face a greater competition from the current market. As a result of federal legislation repealing provisions of Glass-Steagall Act, nowadays the banks may perform securities-distribution services themselves and thereby have become potential new competitors in the proprietary fund-services market. Besides that, the consolidations in the banking industry have reduced the total number of customers in the market. These have become external threats to the business of Fund Service Business Unit. The lack of cost information by activity and customer also inhibiting Fund Service from identifying cost-reduction opportunities to mitigate continuing margins pressures. This is the internal threat faced by the business unit. 

These threats have made Carl Haines, the chairman of the board & Chief Officer of XYZ Investment Company to launch a project to cope with it. As the external threats are not under the company’s capability to solve it, thus the project launched for sure has objectives of solving the internal threat, which is setup a tool that can collect the information of how the money is spent and where it has spent to, and therefore can manage the property of the company in better way. 

After brainstormed with his senior accountant, Terry Smith, Carl decided to use Activity-Based Costing (ABC) system as the tool to achieve the objective stated. Terry will be the project manager for this project since he has some experience in using the tool and he was just come back from a Strategic Cost Management Conference. The key tasks that identified by Terry to implement ABC system are:

• Define model structure
• Identify model cost drivers
• Define users and security requirements
• Create report specifications
• Access cost driver data availability
• Design interface specifications
• Prepare final design document
• Build interfaces 
• Setup model in ABC software
• Collect and load resource and driver data
• Conduct test run of model
• Review and validate model results
• Prepare materials and present findings

After identify the drivers and objectives of the project, next we have to identify the stakeholders of the project. A stakeholder is anyone with a valid interest in your project. If your project affects someone else's work, they're a stakeholder. Some stakeholders will have direct input into your project - some will even have signoff - while others will simply have a representative of their interests (a UCD specialist will represent the users for example). Projects are hard when stakeholders have different agendas, goals and priorities. As well as managing the project, a big part of a Project Manager's job is keeping the stakeholders aligned with each other and with the project team. Anything you can do to help will be appreciated. Hence, we can see that stakeholders play an important role in determining the successfulness of a project. 

For the project run in Fund Service Business Unit, the only stakeholder identified by project manager, Terry, is Carl. As the project was issued out by Carl and he was the Chairman of the Board & Chief Executive Officer, thus as long as Carl is happy with the outcome of the project, then everything should be fine. 

PHASE 2: PLANNING
Estimation on task duration is a critical issue in project planning. In this case, the planning involve assignment of resources form different department, Terry which is not much expose to other field carried out a meeting with experience executive to obtain advice, determine following task and estimate the time require to finish the task. He first set up a meeting with Barbara Gibbons to get her perspective and buy in on the project. In the meeting with Barbara, the task duration and precedence relationship of the tasks in model structure, identify the model cost driver, defining the user and security requirements and create the report specification is determined. Follow by having a meeting with head of technology for FS, Paul Desmond, to discuss the information technology elements of the plan. The task duration and precedence relationship discussed above include the assessment of cost driver data availability, design interface, final design document interface building setup model in ABC software task. Following task which is collecting and loading resource and driver data, conduct test run of the model and reviewing and test run of the model is define by Terry and the task duration and precedent activity is estimate by Terry himself. Next step is generating the resource requirement and get approval from other head of department. After the following steps Terry have to come out with the detailed project plan and project team orientation materials. Thus the component of the project plan such as project work breakdown structure (WBS), project milestone and deliverables, project schedule, project resource, project risk and project budget have to be identify firstly.

In the work breakdown structure, Terry had to break down the task into more detail component to improve the accuracy in estimating the duration of the task. On the other hand, In order to identify the individual tasks in a project it is useful to create a Work Breakdown Structure. The purpose of a WBS is to decompose the project into steps and sub-steps. Thus the WBS is the foundation for the detailed project plan. Steps to generate the WBS include firstly, gather the team together and brainstorm all of the tasks and sub-tasks in the project, next are to write them down and gather different activity written by each project team members with thought of as many tasks as they can. Follow by arrange the task generated into groups under the major areas of activity. Lastly, add, modify, remove and shuffle the sticky notes until the WBS is accurate, complete and logical. 
The project schedule is a calendar that links the tasks to be done with the resources that will do them. Before a project schedule can be created, the Terry must have a work breakdown structure (WBS), an effort estimate for each task, and a resource list with availability for each resource. If these are not yet available, it may be possible to create something that looks like a schedule, but it will essentially be a work of fiction. A project manager’s time is better spent on working with the team to create a WBS and estimates than on trying to build a project schedule without them. The reason for this is that a schedule itself is an estimate, each date in the schedule is estimated, and if those dates do not have the buy-in of the people who are going to do the work, the schedule will almost certainly be inaccurate. Thus Terry as a project manager is responsible in coordinating the workers from different department to work as a team.
For each task, it may require one or more resources allocated and depends on the complexity and duration of the task.. To do this, Terry must first assign the task to people who will perform it. For each task, Terry must identify one or more people on the resource list capable of doing that task and assign it to them. Once a task is assigned, the team member who is performing it is not available for other tasks until the assigned task is completed. While some tasks can be assigned to any team member, most can be performed only by certain people. If those people are not available, the task must wait.
Risk management is an important part of project management. Although often overlooked, it is important to identify as many risks to your project as possible and be prepared if something bad happens. Examples of common project risks include time and cost estimates too optimistic, customer review and feedback cycle too slow, unexpected budget cuts, unclear roles and responsibilities, stakeholders changing requirements after the project has started, stakeholders adding new requirements after the project has started, poor communication resulting in misunderstandings, quality problems and rework and lack of resource commitment. Thus Terry has to identified to the risk, prepare the solution for the risk identified and if possible prevent the risk from occurring.  
Hourly rates for development time, escalation costs for rapid development, and pricing of tools and other resources can fluctuate based on little more than what the client can afford. For the Terry the project manager of the ABC, project budget can be consider as a baseline used to determine whether the project is on track It is important to ensure an accurate projection of the amount of money required to deliver a solution. Thus the project budget has to estimate by considering to the cost need and risk. Types of cost in project include; resource rates, the cost of a work resource based on the amount of time that the resource spends working on the project. Rate-based material costs are the costs of consumable material resources, such as building materials or supplies, to which have assigned standard rates. Fixed costs is the total cost that represents the price for doing a task or project, regardless of the number of resources assigned, the number of hours worked, or the amount of materials used. Per-use costs are the single amount that it costs each time you use a resource.
By referring to the project work breakdown structure, project milestone and deliverables, project schedule, project resource, project risks and project budget, Terry is able to develop the detailed project plan and project team orientation material to assist further planning of the project.

PHASE 3: EXECUTING OR CONTROLLING
In the phase of Executing or Controlling, it is crucial to makes sure all the plans are done properly and it follows the milestones that had been estimated in the previous stage. People and other resources need to coordinate nicely to ensure that project objectives are met. In short, activities that we need to do in this stage included executing, monitoring the project plan, controlling changes, reporting project performance, modifying the project plan and obtaining acceptance for plan modifications. 

In this case, executive should always follow up the status, measure the ongoing various project activities in the real time. By the information that obtaining from measuring progress, we are able to compare the actual with planned performance. A gap analysis can be used as a basis for testing the project status. Smaller gaps between the planned and actual performance indicates that the better the outcome. Once we detect a significant deviation from the project plan, it becomes necessary for us to engage in some corrective action to minimize or remove the deviation. 

In this project example, they are facing some problems in their project during their executing phase. These problems included unexpected change in scope, inability to get a decision and staffing issues. 

Unexpected change in scope is the problem that will be faced in most of the project executing phase. In this example, Carl had decided to include Fund Operations in the project’s scope. This had made up some changes in the project execution and a resources re-allocation need to be done due to ripple effect. The main issue of consideration is “How Do You Get Rid of Blind Spots on Your Project” in the prior stage of project planning. The globalization is forcing our world, how everything started, to what it caused and how we should act in order to succeed. One of the things we took from it, is that in our world you should always be aware to the changes in the environment (no matter what), adjust ourselves and not fight it. Good preparation will improve our reactions during unexpected changes. Risk mitigation activities should do it. By identifying potential risks, preparing the mitigation plan and so on, we can be ready for it, but it’s still a change.

For inability to get a decision, in this project example is stated that Terry just decided on his own judgment to pursue 2 alternatives simultaneously in Call Center Department due to emergency in making a important decision to correct the bias in the initial plan. Terry is forced to do so because of the top management hope to have more meetings and discussion before changes had been made, but the timing is seem as a critical factor for Terry to make the change. It is difficult to confirm whether our managers and employees are aligned to the organization's goals and are committed to their urgency. Executives communicate company goals, speak to them often and even write them in newsletters. Unfortunately, there is little or no testing done to ensure the goals are understood and employees are committed to them. As executives communicate goals to the front line, major distortions occur in the goals' urgency and importance. This leads to front line workers seeing conflicts in what they are asked to do and whether their work relates to corporate goals at all. 

• How do executives communicate in a brain-friendly way that also tests for buy-in? 
• How does a company create an open dialogue as to the best way of taking actions to meet the organization's priorities? 

These 2 questions need to solve in proper way in order to eliminate the problem of inability to get a decision in project executing phase.

The last problem facing by the department is staffing issue. Staffing includes practice from recruiting, selecting, and establishing workforces for a project, and even firing them when they are no longer needed. Project management staffing solutions must incorporate proper inside thinking to produce strong firm results. Human resource management is the process of managing people of the project with the human approach, which means employing and deploying people, developing and utilizing their skills, maintaining and compensating their deliveries, and directing their forces towards a project goal. In this project example states that even Terry had given another individual to assist him for one day a week, but he having difficulty making this resource productively. This may be cause by the individual assigned is not met the requirement of the following position. Furthermore, the staff is only assign to Terry once a week and this mean that the staff is not really clear about the overall flow of the project and even the ultimate goal. This raise up a lot communication problem and the time is wasting just for the staff to follows up the thing before he/she get familiar with the task assigned. In a project, the human workforce remains the nucleus energy, thrusting the project brim to the maximum extent for object fulfilment. So we can conclude that human resources department plays the important role in human power allocation and this is the important factor for leading the project to the journey of success. 

PHASE 4: CLOSING 
As we can see, now the Call Center model had identified 15 unique cost-reduction opportunities and one opportunity for additional revenue generation. And all this achievements obviously supported the organization’s revised competitive situation. Now, the project team was mobilizing to create the Fund Operations ABC model that Carl had requested late into the FS pilot application. It is in the way toward move the Call Center model from a pilot to a mainstream mode, which could be used by the business on a regular basis. So we can conclude that the project is very successful. 

Through the project, there are many things that can be learned along the way to completing the tasks. It is impossible to achieve 100% successful in the project. Mistakes can be happen in the project initiation, project planning and executing/ controlling. After a mistake is identified, it is important to adjust it immediately. By adjusting the project, the initial plan has to be changed to suit the latest developments. Therefore, it is very important to learn from mistakes. The first point is to consider the internal factors that might affect the project. The project planning must be produced only when we have done a good study on the whole project concept. It is not use to only make management team happy, but more important issue is to look through every detail in project. The second point is to ensure the consistency and continuity of the project between phases in different stages. Although we understand that the project will not be done 100% ideally, but what we can do is to minimize the deviation of the project during executing and implementation. In ABC project, the planning is merely done by Terry Smith and Carl Haines, during implementation, the deviation from what they planning is very obvious and the things had not turned out quite the way they planned. Problems like unexpected change in scope, inability to get a decision, and staffing issues emerge gradually during implementation. The most important is how they adjust the project until it fulfils the initial objective of the project. 

Typically, after finishing the project, the team members are either sent back to their initial departments or moves on to the new project. In this case, the team is assigned with a new project which is the continuous of the previous project. In this new project, Terry was responsible for updating the Call Center model via manually survey with call volume data by customers. After finishing the task, the project is consider finish and thus the team members are sent back to their initial position. Therefore, Terry will return to his position as Senior Accountant. 


ACTIVITY 2
The plan developed was not adequate in addressing all of the issues of the project scope. However, there is no sufficient information for us to generate new or alternate project plans because of insufficient information.

The things that can be improved in the project plan are:


1. Project Budget
a. The information about the amount of resources (money) used in using these individuals for the project instead of using them in their default jobs.
b. The information (their wages) were not provided at all
c. Good project planning would have included the project budget.


2. Work Breakdown Structure
a. Only the main tasks were identified and allocated to resources. However, there is no further work breakdown structure to suggest what subtasks that goes to which resources.
b. The main concern is that there is no proper allocation and description about what work will be done under each main tasks.
c. If only one resource is supposed to handle it then it is fine but problems and complications arise especially when there are 2 or more individuals involved.


3. Project risks
a. There is no risks identified at all and also there is no contingency plan to minimize the damage taken should there be any complications during the project.
b. Neither is there any information regarding a way to handle crisis or risks for the project.




Wednesday, December 2, 2009

Fogging 2 December 2009


Fogging again, this is the second time already and we had been informed that they need to come in our house this time. Shock, this is the expression of my mum and my neighbor because before that they just fogging around the resident area. Wao, the time is rushed, and without any hesitation, we cover all the things with newspapers and move all the things into room.

After fogging, the floor is a bit oily but that is much more better if compare to last time which happened more ten years ago, like splashing the oil ==’’’. The thing to prove here is at least some improvement of the technology is done. Actually this government department is quite okay at least they do their responsibility to eliminate dengue. Some more the people are quite nice and polite.

that is me lu, looking at my house :P

Phew, finally I success to renew my driving license at this morning and the process is more faster than I expected. We had been informed that there is no electric supply in our residence area for tomorrow, so I had planned to go Penang for my 1 day trip, because I cannot stay at home with computer but I cannot turn it on. Seem like now everything is jammed without the electric supply unless for those kids that can play with their candle and shadow at the night. I am not a kid, but sometimes feel that life suddenly slowing down with that… sometimes the feeling is great because let me have more chances to feel the real, but don’t always la… this is 1, 2, 3, 4 …. Many times already, can’t even remember, but at least 1 a week in this month… ==

this aunty is wearing her earring in the middle road... @@ she want go to dinner soon

Still haven’t found any one that want to join me and seem everyone had busy with their own things and work, again I feel lucky that I am yet a student :)

Tuesday, December 1, 2009

Yes, finding laptop? 26 to 29 September 2009


I had been worked in PC fair for these 4 days, and the phrase above, “yes, finding laptop, we got Toshiba, Dell, Lenovo and Acer”. This is the most common phrase that we will use to break the ice between the customers with us, and seem the technique is important for us to get closer to the customer that taking to a stranger… ==’’’ yes, we are stranger. Still remember that the first that I work at the fair, I don’t know how to intro the laptop to customer, and not even know how to sale it, until I saw how our top seller to convinces the customer. The first rule is you should convince yourself before you can convince other. Sometimes I will laugh because I saw other seller very ‘Jia’… “Yes, I am using Dell laptop now, the service is very good, 1 year onsite warranty some more”, by the way she is using Toshiba laptop. “ya, I am sure kak like pink colour, because you are wearing pink colour shirt today…” Oh my god, that is not me, you are welcome to slap me if you found any of these phrase come out from my mouth. ==’’’ but so far so good, that is the rule to survive in this super challenging world. 

having our lunch 

My boss promises me to pay me 70 buck per day and she said that will give us 5 to 10 buck per laptop sold. That is not a lot because I need to work from 9.30am until 11.30pm without any rest time between that time. That is kinda tired and until the last day of the fair, sore throat is coming to me… erm, because I am selling hard I think :P actually I work for this part time job is to learn something and I am satisfied with what I am expects to get from it. 

cleaning at the end of the fair

Sigh, I went for 2 post offices to renew my driving license but both of them are facing the same problem, that is server down. Haiz, this is the thing that keeps on happened, even in the library in the school. Luckily I already get used to it.
Before ending the blog, just realize that today is World AIDS Day. No much to say about that, support. :)  

Wednesday, November 25, 2009

Blogging 25 November 2009

 Almost 1 week stay at home, nothing to do and only slack in front of the computer. I have to start my FYP in this week. Most of the final year student will stay at school for their FYP progress, but except me and some minority. I planned to stay at home rather than in school because I feel that the life at school is kinda boring. Moreover, my mum and dad had started to chatter since my bro and I seldom come back to home during the weekend of the school days, even the journey is only 1 hour plus between school and my home. Sigh, 1 hour is for travelling by car. By using the public transportation, I had to call for the taxi, take the bus to Butterworth, again take the bus back to SP and walk for a short distance before I reach my home. This is actually nothing but once the bus routing is delayed, sometimes I have to wait for it for almost 1 hour for the uncertainty. The condition is kinda like: ada bus u naik, tak tau bila bas tu sampai. Still have to count for the journey which comes back from home to school…

Doing FYP in front of computer but I cannot stop to control my mind to surf the net. MSN, blogging, forum and Facebook. Still imagine how Facebook deprive our time. I didn’t addict with that, but I admit almost every time I online, I will surf for it. Playing the Happy Farm is my must have activity, but now seem like a bit boring because the feature is almost the same from the start to the end.

Soon I will go out for work already at PC fair. Today is simple setup and short briefing from the boss and it will follows by 4 days fair consecutively until next Sunday. My bro told me that the job is not easy and I also knew that especially for the job which deal with customer… haha, anyway I am only a part time worker, won’t be so stress maybe, if yes, shall I take this as a practice before I striding the stage out from the university? Just gain some extra working experience from there, earn so pocket money and survey for new my laptop or external hard disk, I stone, many birds. :)  so anyone if got come PC fair come and visit me ya, serve you with sweet smile.. ==’’’

Friday, November 20, 2009

Survey for a new laptop 20 November 2009

Recently my desktop seem got some problems, once you turn it on for about 30 minutes or sometimes even lesser, it will hang for a moment and then follow by auto restart my computer. It is suspected that the motherboard got some problem with that and deciding whether worth for me to replace a new motherboard or just go toward my dream for a new laptop. 

Now I start to survey the information online, including the price, specification and even the type of brand. Just finished search for some information on lowyat.com. Here is some information I get from there:

The research also shows the malfunction rates by manufacturer, guess who’s the most reliable manufacturer? Asus and Toshiba are neck and neck, with only a 15.6% and 15.7% of malfunction rate at 3 years. Check out the chart below. Would you buy extended warranty? You agree with it???

Thursday, November 19, 2009

Holiday again 19 November 2009

with coursemates after the last  paper-Project Management
From today, there is the start of my school holiday until 27 Dec. The vacation is almost 1 months plus. Sometimes don’t know what am I thinking, sometimes feel likes so eager the holiday to come but once this realized, I feel like a bit blankness. Haha, I am man in contradiction. Exam seems is the only way that makes the students have willingness to thrust and move forward. Exam can act as some event that to prevent the study life to becomes less stagnant and apathetic… is it?? 

What I going to do in this 1 month holiday. Now I start to think about it and plan my short milestone for next month. Next week maybe I will work temporary in PC fair for 4 days with my brother. Perhaps I can earn some extra pocket money before I graduate. Then, I will start to do my FYP. Many final year students will stay at school to do their FYP but I didn’t plan to stay because I can do my paperwork at home and just start my prototyping after the school reopen. When at home, I will take some time to take sport, photography, meet my friends in hometown… hope I can realize what I am listing now. Actually I just want to avoid I keep stay in front of the computer and addicted in computer games and drama. 

After the holiday, 1 more semester I will graduate already. Next semester will be very free, only 11 units plus 1 unit extra for ping pong. I expect that I maximum will have class 3 days per week only. Hope that I can use my time wisely next semester… ganbate.




Sunday, November 8, 2009

6 months 8 November 2009

light up my life 

6 months already, I had learned a lot of things within these 6 months and I knew these things will make me growth. I learned the things from mistakes, and sometimes I even write down some important event in a piece of paper, hope that this will be a remainder for me to not repeat the mistake. Besides that, I will always remain myself to treat every single day as a new fresh day, just like the feeling of falling in first love of the first day. By the way, I can cherish every single day I have, as long as I stay in healthy and my friends around me stay healthy too. Some people say that trouble is a thing that occur once awhile and should be avoided because it makes our life in trouble, but I will rather say that trouble is a thing that happens all around the time, it is a part of our life. 

If I need to rate my own performance in these 6 months, I will only rate it as 50%. Why? Because I feel that sometimes I am too dependent and my thinking is immature. Don’t let emotion to take control and this is the thing that I always remain myself to do. Still got a lot for me to improve, and I will work hard ^^. 

Recently I kinda busy with preparation for my exam. Even though, the life is pretty simple, just follow the pace of life—wake up, eat, study, play computer games. Sometimes I think that this maybe is the ideal life for me, just very simple, I like it, it light up my life.

Sunday, October 18, 2009

Just nothing 17 October 2009

Just nothing doesn’t mean that there is really nothing happened in this few weeks, but most of the time I treat the “nothing” as a good thing. Start to have a brief to talk about my journey in September to KL, that is a nice trip and I had spent all time with my best friend. Even though you are very busy, but still manage to bring me here and there. Em, still remember that we went to Pavilion by bus because it will let me experience the difference. There are a lot people on the street and busy buying their thing just the day before Ray, this makes the traffic along the destination becomes a bit jam. You had explained a lot of place for me to know patiently. It is nice. When the way coming back, there was raining out there and we ran along the street to the train station in KLCC… Haha, you run so fast and still can jump here and there over the little pond on the footpath… so funny. Thank you for the nice trip.

lunch in Juru, Seoul Garden

Now talk about the mid autumn festival, I went back to hometown and go out celebrate my friend’s birthday in café. After the celebration, we go to garden and see other people playing with their lantern. Suddenly feel that the pace of the life is slowing down while we are walking in the garden and talk some gossip about other people. Haha, I know that gossiping is not good, but we treat it as “update” our information among each other since we are long time didn’t contact already… asked about their job condition after graduate, their further study… we chat until 1 am in the garden and that is a great experience if you got time. Haha, actually this is said by my friend and I not dare to say that because the phase looks too serious and exaggerated. I will rather say that we are busy than we have no time. I am just a student only ma, time is always there, take it out and you got it. 

campus walk in night with lantern

At 6 October 18, I went to Autocity with all my course mates for the final year gathering. Oh~~ now just realize that we are going to graduate very soon and this is the first lunch gathering for the whole course. Almost all the course mates had attended this gathering and sure we take this opportunity to have a photography section. Haha, actually photography is a must have section in all of our gathering, all of us seem like got a built in sensor just special for sense the lens. Running here and there to catch photo, tired @@. 

with coursemates during mid autumn festival

The next day, 7 October, all Chinese course mates attend the mid autumn festival night in our school (actually the festival is over). All of us take our lantern and have a campus wall. This is the last campus walk with lantern in the night with my course mates already, appreciate it. Then the following week got birthday celebration with 2 Malay girls. Why so many people birthday in this month… huhu…

the  cheese cake becomes like this after cut @@

Monday, September 28, 2009

30 Hour Famine 22 august 2009

insect ^^


I had attended the 30 Hour Famine campaign that organized in my school, at 22 August 2009. 30-hour famine, it means that we should fast for 30 hour during the whole duration of the camp from 12pm of Saturday until the 6pm of the next day. There are more than 90 students registered for the camp, but due to the influence of the H1N1 disease and a lot of assignments or test going to stress up the students, the number of people attended to this camp is left about 40 people. For your information, our school is an exam based learning style, so we are get use to an activity becomes spoiled by this kind of reason.my team members and me

This famine mini camp was held in everywhere in Malaysia at the same time. The purpose of this camp is exposes us to what has happened in another side of the world, how poverty threaten them and deprive their right to go to school, how they live in hunger and finally becomes more concern about the issues of social.
Some of the children spend their whole day, or can say as spend their whole childhood to stay along the railway, just because they want to collect the little fragment of charcoal that dropped by the train, which carry full tank of uncovered charcoal pass by. What they can do is hope for an old train pass by everyday, so that more vibration… stronger wind blowing? So more little charcoals will fall down. This is how the children at there to earn money.station game... me is on the left

Some people spend more than 8 hours per day, just forth and back to get the fresh water for drinking purpose for their family. Unfortunately, maybe I can’t even say that, that is a fresh water. This is the how they survival, just for water, how about food? That we never know. Besides these, some of them even suffer for HIV. Lack of knowledge about prevention and treatment make even their children suffer for that. Malnutrition problems are serious among the children.
In the camp, besides listen to the stories, still got some station games, movie sharing and all of these are not just for fun, but it educate us, make us aware of that from the game.
World vision is going to teach them how to be a better fisherman and not just catch fish for them. This indicates that they need a chance for them to escape from poverty and hunger, our helps and concern about them is important for them. Cherish what we have, don’t waste things, even the money is yours, but resources is belong to everyone. That is what I learned from the camp.
After fasting for more than 30 hours, we are not hungry, but some of us just miss the tasty of the food, too bad… haha